Reconstruction / Planning Operation Control Center Fortuna North
and adjoining rooms for RWE Power AG

Period January 2011 - October 2012
Design / Completion 2013
Special feature: 2 levels in 1

Services / Content: disciplines of interior finishes
(floor/ interior walls / furniture / ceiling / lighting)
preplanning and design planning, detailed designtender specifications.